Wilson Engineering - Survey and Engineering

805 Dupont Street, Suite 7 | Bellingham, WA 98225
(360) 733-6100 | info@wilsonengineering.com

Moses Lake Wastewater Treatment Plants

Larson The Larson plant is a 0.75 MGD facility designed to meet advanced effluent standards and used to recharge groundwater. 

Project work included, industrial waste surveys, developing Facility Plans, Prequalification of Contractors, design and build for wastewater treatment facilities consisting of mechanical screening, activated sludge, aerobic sludge digestion, stand-by generator, sludge dewatering, UV disinfection, influent lift station, rapid infiltration, and related facilities.

 

 

DunesThe Sand Dunes plant is a 4.0 MGD facility designed to meet advanced effluent standards and used to recharge groundwater. 

Plant consists of two Biolac Activated Sludge treatment systems, Trojan UV disinfection, mechanical screening with aerated grit chamber, and Long Term Biosolids Digestion Basin (LTBDB).

Includes rangeland enchancement by surface application of Biosolids.

 

 

Related Projects

Client Contact

Mr. Gerry McFaul, P.E., City Engineer
Phone: 509-754-5088 ext. 3148
(now with Grant County PUD No.2)

Project Team

Location

Moses Lake, WA

Markets

Copyright ©2011, Wilson Engineering. All Rights Reserved.
Website by Mindfly Web Design Studio