Moses Lake - Dunes Wastewater Treatment Plant

Project Overview

The facilities are designed to meet advanced effluent standards and used to recharge groundwater. 

Project work included industrial waste surveys, developing Facility Plans, Prequalification of Contractors, design and build for two wastewater treatment facilities consisting of mechanical screening, activated sludge, aerobic sludge digestion, stand-by generator, sludge dewatering, UV disinfection, influent lift station, rapid infiltration, and related facilities.

Client Contact

Gerry McFaul, P.E., City Engineer
(509) 754-5088 ext. 3148
(now with Grant County PUD No.2)

Location

Moses Lake, WA

Related Projects

Mattawa Wastewater Treatment and Collection

Planning, design, funding, inspection and construction phase services for 0.6 MGD WWTP and new sewer collection system. Funding for the project included grants and loans from PWTF, CDGB, SRF, CCWF, and RECD. The project also included Small Town Environment Program's (STEP) community labor and volunteers and use of prison labor.

Moses Lake Wastewater Treatment Plants

Engineering and construction management for two new wastewater treatment plants (4 MGD and 0.75 MGD), and a new headworks facility.

Wrangell Water & Wastewater Treatment Plants

Planning, design, permitting and construction phase services for a new Water Treatment Plant and upgrades to a 600,000 GPD Wastewater Treatment Plant.