Wilson Engineering - Survey and Engineering

805 Dupont Street, Suite 7 | Bellingham, WA 98225
(360) 733-6100 | info@wilsonengineering.com

Soap Lake - Wastewater Treatment Plant Upgrades

Facility Plan, design, construction phase services of a wastewater treatment plant upgrade.  The upgraded facility consists of an extended aeration plant with sludge digestion, dewatering and disinfection.  The effluent is discharged through rapid infiltration basin.

Related Projects

Client Contact

Mr. Wayne Hovde, Mayor

(509) 246-1211

Project Team

Location

Soap Lake, WA

Copyright ©2011, Wilson Engineering. All Rights Reserved.
Website by Mindfly Web Design Studio