Provided engineering, surveying, and construction management services for a new 8” HDPE Gravity Sewer through Boulevard Park, Grease Interceptor, 6’ Diameter Flygt Fiberglass Package Pump Station, full SCADA Integration, and 2” HDPE forcemain over a railway crossing. Project also included beach design and stabilization and miscellaneous park improvements. Package fiberglass pump station was chosen to prevent any contaminated groundwater intrusion and included odor control for the park environment. The project included work in contaminated soils which required a less obtrusive design and planning for removal and disposal of soils and groundwater.
City of Bellingham
Bellingham, WA
Design through construction services for a reclaimed water line and pump station
Civil design including utilities for two new spray parks at Cornwall and Fairhaven Parks in Bellingham.
Ongoing program to replace aging pumps and controls and upgrade SCADA for existing sewage pump stations in sensitive lakeside and watershed environment.