Planning, design and construction phase services including full-time inspection for a permanent, one-mile long intertie between two existing District water systems. Work included study of rate impacts, PWTF loan package, easements, environmental permits, reservoir analysis, complex SCADA modifications, new booster station, upgrade of existing booster station, and emergency power.
Bill Hunter, PE, District Engineer / Assistant General Manager
Lake Whatcom Water and Sewer District
(360) 734-9224
Whatcom County, WA
Contract inspection for City of Blaine of new developer-constructed utilities and roads to required for a new 90-home subdivision.
Wilson Engineering has provided engineering and surveying services for a wide range of public works projects for the City of Everson for over fifteen years.
Design and construction phase services for new well, chlorination system and transmission main to increase the municipal water supply and improve system reliability. Project included 400 square foot building and emergency power generator.