Project consisted of design and permitting of two 42,000 gallon LOSS Holding Tanks and collection sewer piping for a worker camp at the Munger Farms. Permitting was with Department of Health LOSS Program and Whatcom County Health.
Munger Farms
Sumas, WA
Design, Construction, Permitting, and Value Engineering for a new 100,000 GPD MBR Package Plant.
New Extended Aeration Wastewater Treatment Plant design and construction.
Civil engineering sitework, stormwater engineering support, environmental compliance and permitting assistance, and and compliance monitoring survey for cleanup of the Eldridge Landfill site.