Detailed preliminary engineering analysis, topographic mapping, design, bidding, inspection and construction phase administration services, for the Mission Road improvements between Robinson Road and Chestnut Street, and from Chestnut Street to SELCO Lumber Co. Project included 3,300 feet of road reconstruction with new curb, gutter and sidewalks. Stormwater treatment included infiltration basins and bioinfiltration swales. Projects received federal funding and Transportation Improvement Board (TIB) funding.
The boundary and Right-of-Way determination for this project involved numerous historic conveyances of railroad property, and numerous territorial-era highways.
Rick Holt, Public Works Supervisor
City of Everson, Public Works
(360) 966-3411
Everson, WA
Design, surveying and construction services for Bob Mitchell Road South. New road is designed to accommodate heavier Canadian truck loads.
Civil design and surveying services for all-weather City/County road extension project to benefit Bellingham Technical College, Birchwood neighborhood, and heavy industry.
Reconstruction of a 1/2-mile section of Cable Street and upgrades to pedestrian facilities, stormwater, and water mains.