The City’s drinking water hardness, salinity and disinfection byproducts were at unacceptable levels following reactivation of two City wells. Wilson Engineering performed a thorough evaluation of water chemistry and water supply needs. Prepared a feasibility study and an engineering report, which identified two cost and performance feasible options: sodium free ion exchange and low pressure reverse osmosis. Selected reverse osmosis (capacity 1,500 GPM) as the best alternative. Designed improvements, prepared bid documents and managed construction.
Mike Olinger
Chief W/WW Treatment Plant Operator
Ferndale, WA
Design through construction services for a reclaimed water line and pump station
Design and construction services for new tank to improve reliability and meet high summer demands for an existing water system on Wrangell Island, Alaska.