Facility Plan, design, construction phase services of a wastewater treatment plant upgrade. The upgraded facility consists of an extended aeration plant with sludge digestion, dewatering and disinfection. The effluent is discharged through rapid infiltration basin.
Wayne Hovde, Mayor
(509) 246-1211
Soap Lake, WA
Comprehensive Sewer Plan including sewer system hydraulic modeling and capital plan, along with WWTP Improvements Facility Plan.
Planning, design, funding, inspection and construction phase services for 0.6 MGD WWTP and new sewer collection system. Funding for the project included grants and loans from PWTF, CDGB, SRF, CCWF, and RECD. The project also included Small Town Environment Program's (STEP) community labor and volunteers and use of prison labor.
Engineering and construction management for two new wastewater treatment plants (4 MGD and 0.75 MGD), and a new central headworks facility.