Wilson Engineering provided engineering services for a new extended aeration activated sludge wastewater treatment plant to replace a lagoon system. Design consisted of an aerated grit chamber, mechanical screen headworks, WesTech treatment system, and Trojan UV disinfection for a design capacity of 3.1 MGD. Design also included a biosolids stabilization pond, 3 infiltration basins, sludge drying beds, a plant drain pump station and control building.
Wilson Engineering also provided inspection and construction services, permitting and funding assitance, and land surveying for the project.
Mayor Robert Wyborney
Town of Wilbur
(509) 647-5821
Wilbur, WA
Surveying, design, and construction phase services of WWTP
Engineering and construction management services for new membrane bioreactor (MBR) Water Reclamation Facility (WRF) that meets primary drinking water standards.
Planning, design, permitting and construction phase services for a new Water Treatment Plant and upgrades to a 600,000 GPD Wastewater Treatment Plant.