WWU Water Main Replacement

Project Overview

Project consisted of design and construction management of 1,500 LF of City of Bellingham water mains to replace aging campus water mains. Project work included evaluation of alignments; hydraulic modeling with InfoWater software; topographic surveying; analysis of need for pilings; and preparation of plans, specifications, and cost estimates. Challenges included narrow site constraints, preservation of surface features and trees in Red Square, rock soils, and minimizing interference with campus activities. Included five new service connections and one new fire Line to existing buildings.

Client Contact

Western Washington University

Location

Bellingham, WA

Related Projects

Bellingham Technical College - Campus Center

Surveying and engineering services from design through construction for new campus facility.

Bellingham Technical College - Campus Expansion

Design and construction services for site development and utilities to support campus additions and remodels.

Ferndale WTP Reverse Osmosis Water Softening Project

Following a thorough evaluation of water chemistry and supply needs, reverse osmosis was selected as the best alternative for improving water quality.